-
Tooling
-
Throughput
-
Targeted
-
Tools and Equipment
-
Tooling-Release
-
Theme Approval
-
Technical Assistance Centre
-
Technischer AussenDienst
-
Telekommunikations-Anschluss-Einheit
-
Commercial Trucks
-
-
Total Approach to Problem Solving
-
Thermal & Aerodynamical System Engineering
-
To Be Approved Originator
-
To Be Confirmed
-
To Be Defined
-
To Be Determined
-
To be Established
-
Teilebereitstellungstermin
-
Technology-Center
-
Trouble Code
-
Team Center Automotive Edition
-
Task Control Block
-
Technical CATIA Center
-
Tool Confidence Level
-
Transmission Control Module
-
Total Cost of Ownership
-
Tool Capacity Plan Book
-
Tool Certification Source
-
Tool Content Sheet
-
Traction Control System
-
Traction Control Support System
-
Tool Error Detection
-
Turbo Diesel Injection
-
Total Dimensional Integration Engineer
-
Total Die Integration Engineer
-
Total Design Integration Engineer
-
Technische DienstLeistungen
-
Time Division Multiple Access
-
Technical Documentation and Reproduction
-
Test Data Record
-
Top-Down-Target
-
Technische Entwicklung
-
Test Engineer
-
Toll Ein Anderer Macht´s
-
Triple Electronic Automatic Temperature Control
-
Transmit Error Counter
-
Technical Ergonomic Database
-
TELematics Unit
-
TElematics Module
-
TElefunken MICroelectronic
-
TeMPerature control Left
-
Technical Equipment Specification
-
Tooling and Equipment Supplement
-
Team Feasibility Commitment
-
Things Gone Wrong
-
Chat-Jargon: that is great
-
Tool Impact
-
Telecommunications Industry Association
-
Technisches Informations Center
-
Technical Information Centre
-
Target Implementation Date
-
Technical Integration Engineer
-
Stufe, Rang, Reihe
-
Tungsten Inert Gas
-
Traffic Information System
-
Test Incident Reports
-
Traceability Identifier Reqirement
-
ToleranzKettenUntersuchung
-
Technische Lieferbedingungen
-
Technische Leitlinie Dokumentation
-
TechnikModell
-
Test- und Messtechnik Center
-
Technical Manual Coordinator
-
Traffic Message Channel
-
Technical Memory Data Base
-
Total Manufacturing Integration Engineer
-
Top-Management-Kreis
-
Top-Management-Kreis-Konferenz
-
TeMPerature control Right
-
Technical Manual Specification
-
Thermoneutral Zone
-
Table Of Content(s)
-
Target On Evaluation
-
Targetorientierte Konzeptfindung
-
Technologiephasen Optimierungs Prozess
-
TagesOrdnungsPunkt
-
Total Online Project System
-
Terrain Optimisation Switch
-
Test Point Analysis
-
Technische ProduktBeschreibung
-
Test Process Improvement
-
Technical Project Leader
-
Total Productive Maintenance
-
Tire Pressure Monitoring System
-
Technische Planung PKW
-
Technischer ProgrammPlanungsAusschuss
-
Total Progress Report
-
Temperature/Pressure Relief Valve (water heater)
-
Total Process Time
-
TeilePreis-Umlage
-
Total Quality Group
-
Traction Control System
-
TRC
-
Transportation Recall Enhancement Accountability Documentation
-
Theory of Inventive Problem Solving
-
Technische Revision Lieferanten
-
TRailer Module
-
TeleStartAnlage
-
Technical Safety Concept
-
Time Sharing Option
-
Technical Safety Requirements
-
TechnikTräger
-
Target-Commitment Teil f?r Teil
-
Tool Trials
-
Time Triggered communication on CAN
-
Transatlantic Trade and Investment Partnership
-
Trailer Tow Module
-
Tool Try-Out
-
Time Triggered Protocol
-
Teile-Umfangs-Liste
-
Technischer Überwachungsverein
-
Total Variation
-
Total Validation Integration Engineer
-
Total Value Management
-
Television Module
-
Transient Voltage Suppressor
-
Total Vehicle Validation Engineer
-
Test Work Order
-
Temporary Work Order
-
Chat-Jargon - träum was Schönes
-
Transmit / Transmission
-
Thermostatic/Thermal Expansion Valve